![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
The Topside
6BTM-5.9 installed |
![]() |
machining the rudder stock at Seaboard Marine
|
![]() Check out Tony and Seaboard Marine on the 'net! |
deck framing |
![]() |
and steering |
![]() |
Nightmare! |
![]() |
work deck |
![]() |
framing |
![]() |
showing shower, bilge ventilation and scupper |
![]() |
and sheer for side decks - combination hanging knee and rod racks |
![]() |
faired in |
![]() |
radius knee |
![]() |
|
![]() |
battery box, ventilation, step and seat |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |